RECOVERY PLAN
Aragón sin Gluten S.L. has received aid from the European Union under the Next Generation EU Fund, within the framework of the Recovery, Transformation, and Resilience Plan, to invest in a ground-based solar photovoltaic installation for self-consumption at its center in Tauste (Zaragoza).
This initiative is part of the Ministry for Ecological Transition and the Demographic Challenge’s incentive program linked to self-consumption and storage with renewable energy sources, as well as the implementation of renewable thermal systems in the residential sector.
This initiative generates savings in the plant’s electricity consumption through renewable solar electricity generation, avoiding the generation of greenhouse gases and the consumption of natural resources from non-renewable energy sources.
